Skip to main content Skip to search Skip to main navigation
Please note our information regarding customs and duties. Delivery available from £140.
Average rating with

Average rating of 4.9 out of 5 stars

(4.91/5.00) calculated out of 2927 reviews

Concealed Body

  • Compatible with PaulGurkes faucets for PGBASIC
  • Made of solid brass
  • 4-way / 3-way / 2-way / 1-way
  • Integrated level for easy installation
  • Includes sealing sleeve for joint sealing

Installation Instructions

Connect the outlets according to the following guidelines:

  • Bottom outlet: Hand shower
  • Top outlet: Tub spout

By connecting according to these guidelines, you can easily use a different faucet. 

Concealed Thermostat Faucet

The faucet is delivered in the standard configuration with a 2-way trim (Rain shower / Hand shower) . To use two outlets, the concealed body must be connected accordingly.

  • Made of solid brass
  • High-quality chrome finish
  • Suitable for 2 outlets, e.g., rain shower and hand shower or tub spout
  • Switching the outlets by turning the diverter
  • Required body PGBASIC
  • Durable thermostat cartridge
  • Safety lock at 38 °C protects against accidentally hot temperatures (burn protection)

Tub Spout

  • Round design
  • Made of solid brass
  • Chrome plated
  • With aerator
  • Outlet diameter 28 mm
  • 1/2" thread

Wall Connector with Bracket

  • Made of solid brass
  • High-quality chrome finish
  • Bracket angle is fixed
  • Trim diameter 5.7 cm
  • Backflow prevention according to DIN EN 1717
  • 1/2" external thread

Hand Shower

  • Round handheld shower
  • Made of solid brass
  • High-quality chrome finish
  • 1 function
  • 56 nozzles
  • Length 18.7 cm
  • Diameter 2.4 cm

Shower Hose Length 120 cm

  • The double-sided 1/2" swivel cones prevent twisting of the hose. <\/li>
  • Made of stainless steel, polished to a high gloss
  • Double winding (overlapping) for high tensile strength
  • Kink-resistant, durable, flexible
  • Swivel cones made of solid brass, high-quality chrome plated
  • Certified: KTW recommendation, EN 1113, NF077
  • Made in Germany

Shipping

  • Shipping weight: 5.14 Kg
  • Shipping method: Paket

Product Safety Regulation

Manufacturer information:

Name des Herstellers: PaulGurkes GmbH

Postanschrift: Bördestr. 7, 31135 Hildesheim, Deutschland

Elektronische Adresse: anfrage@paulgurkesshop.de


Letztes Update: 13.04.2026, 08:08:45

Für dieses Produkt wurden noch keine Kundenbilder hochgeladen.

Weitere Kundenbilder zu im Set enthaltenen Produkten

PaulGurkes Concealed Body for Faucets up to 4-Way

PGBASIC

£74*

PaulGurkes 2-Way Concealed Thermostat Mixer for Base Unit PGBASIC

PGTHR23W

£168*

PaulGurkes Round Wall Connector with Shower Holder

PGHPWAB002

£29*

PaulGurkes Round Bathtub Spout Water Inlet Valve

PG8P

£30*

PaulGurkes Round Hand Shower in Chrome Plated Brass

PGHPBHS004

£28*

PaulGurkes Stainless Steel Shower Hose 160cm with Swivel Connectors

PGdoubleAgraff160

£16*

Documents of the products included in the set

PGBASIC

[pdf] PGBASIC-v1.2
Components
Nr. Komponente Anzahl 1 Wasserwaage 2 2 Pappkarte 1 3 Wasserwaagenrahmen 1 4 Schraube 6 5 Spülvorrichtung 1 6 Dichtung für Spülvorrichtung 1 7 Pin 2 8 Dichtmanschette 1 9 Grundkörper 1 10 Spreizbolzen 4 11 Innensechskantschlüssel 1 12 Verschlussstopfen 3 13 Montageanleitung 1 Zertifikat & Videoanleitung unter: 14 1 www.PaulGurkesShop.deNo. Component Quantity 1 Spirit level 2 2 Cardboard 1 3 Spirit level frame 1 4 Screw 6 5 Flushing device 1 6 Seal for flushing device 1 7 Pin 2 8 Sealing sleeve 1 9 Main body 1 10 Expansion bolt 4 11 Allen key 1 12 Sealing plugs 3 13 Installation instructions 1 Certificate & Video instructions under: 14 1 www.PaulGurkesShop.de
Installation Preparation
Installationsvorbereitung • Für die Installation der Box wird ein Loch von mindestens 200mm x 220mm benötigt. • Die Einbautiefe beträgt 83mm - 108mm. • Bereiten Sie die Leitungen wie in der folgenden Abbildung vor. • Der Druck sollte 0,5 - 10 Bar nicht überschreiten. Empfohlener Druck ist 5 Bar.Installation preparation • A hole of at least 200mm x 220mm is required to install the box. • The installation depth is 83mm - 108mm. • Prepare the pipes as shown in the following illustration. • The pressure should not exceed 0.5 - 10 bar. Recommended pressure is 5 bar.
Installation Step 1 - Preparation
1. Installationsschritt - Vorbereitung • Merke: Die Box ist standardmäßig für vier Ausgänge konfiguriert. Für eine Nutzung von einem / zwei oder drei Ausgängen blockieren Sie die Ausgänge wie im unteren Schaubild abgebildet. • Bohren Sie die Installationslöcher, wie in der Abbildung zu sehen ist. • Platzieren Sie nun die Box in dem Installationsloch und fixieren Sie diese mit den Spreizschrauben. • Für die Installation in eine Ständerwand montieren Sie die Box wie im oberen Schaubild. • Überprüfen Sie die Festigkeit der Schrauben. • Schließen Sie die Warmwasser und Kaltwasser Leitungen an. • Schließen Sie die Verbraucher nach dem unteren Schaubild an.1. Installation step - Preparation • Note: The box is configured by default for four outputs. For use with one / two or three outputs, block the outputs as shown in the diagram below. • Drill the installation holes as shown in the illustration. • Now place the box in the installation hole and fix it with the expansion bolts. • For installation in a stud wall, mount the box as shown in the diagram above. • Check the tightness of the screws. • Connect the hot and cold water pipes. • Connect the consumers according to the diagram below.
Installation Step 2 - Function Overview
2. Installationsschritt - Funktionsübersicht2. Installation step - Function overview
Important Notes
WICHTIG! • Der untere Ausgang wird zuerst angesteuert (bei 2-Wege Armaturen). • Überprüfen Sie die Richtigkeit der Ausgänge an den Verbrauchern vor dem Verputzen in Abhängigkeit der zur Verwendung geplanten Armatur!IMPORTANT! • The lower outlet is activated first (for 2-way fittings). • Check that the outlets are correctly connected to the consumers before plastering, depending on the fitting planned for use!
Installation Step 2 - Testing
2. Installationsschritt - Testen • Öffnen Sie die Wasserleitungen und prüfen Sie die Montage auf Dichtheit. • Demontieren Sie die Spülvorrichtung und entfernen Sie die Gummistopfen aus dem Grundkörper. • Montieren Sie die Verschlusskappe erneut und spülen Sie 3 Minuten die Leitungen, um diese von Verschmutzungen zu säubern.2. Installation step - Testing • Open the water pipes and check the installation for leaks. • Disassemble the flushing device and remove the rubber plugs from the main body. • Reassemble the sealing cap and flush the pipes for 3 minutes to clean them of dirt.
Installation Step 3 - Plastering
3. Installationsschritt - Verputzen • Wenn die Installation die Dichtheitsprüfung bestanden hat, verputzen Sie die Montage. • Kontrollieren Sie die Position der Box. • Dichten Sie nun die Box im Verbund ab, bevor Sie die Fließen an die Wand bringen. • Verfliesen Sie die Installation. • Schneiden Sie das überstehende Material der Box ab. • Dichten Sie zuletzt die Schnittkante ab. • Die Installation ist abgeschlossen. Montieren Sie nun die Armatur.3. Installation step - Plastering • Once the installation has passed the leak test, plaster the installation. • Check the position of the box. • Now seal the box in the composite before attaching the tiles to the wall. • Tile the installation. • Cut off any protruding material from the box. • Finally, seal the cut edge. • The installation is complete. Now install the fitting.
Important Legal Information
WICHTIG! • Beachten Sie bei der Installation alle erforderlichen gesetzlichen und nationalen Bestimmungen (anerkannte Regeln der Technik) und halten Sie diese ein.IMPORTANT! • During installation, observe and comply with all necessary legal and national regulations (recognized rules of technology).
[pdf] PGBASIC-Anschlussplan-v1.0
Anschlussplan für PGBASICConnection diagram for PGBASIC
MontagehinweiseInstallation instructions
HinweiseNotes
Beachten Sie bei der Montage unbedingt die beiliegenden Installationsanleitungen.When installing, be sure to observe the enclosed installation instructions.
Prüfen Sie die Montage unbedingt vor dem Fliesenlegen auf Korrektheit der Verbraucher!Check the installation before tiling to ensure the consumer unit is correct!
Prüfen Sie die Montage des Grundkörpers in Hinsicht auf die zur Verwendung geplanten Komponenten.Check the installation of the base unit with regard to the components planned for use.
Duschsystem 2-Wege2-way shower system
Duschsystem 3-Wege3-way shower system
Wasserfall DuschsystemWaterfall shower system
Wannenset 2-Wege2-way tub set
Duschsystem 4-Wege4-way shower system
WanneneinlaufTub inlet
RegenduscheRain shower
HandbrauseHand shower
RegenfallRainfall
geblocktblocked
WasserfallWaterfall
Verbraucher 4Consumer 4
[pdf] PGBASIC-Durchflussmengen
Flow rates for PGBASIC
Durchflussmengen für PGBASICFlow rates for PGBASIC
Durchflussmengen in l/minFlow rates in l/min
Single-lever mixer (2-way)
Einhandmischer (2-Wege)Single-lever mixer (2-way)
AusgangOutlet
Warm Gemisch KaltWarm Mixed Cold
B 9,5 10,3 8,8B 9.5 10.3 8.8
D 9,6 10,6 8,9D 9.6 10.6 8.9
B 16,7 18,3 15,4B 16.7 18.3 15.4
D 17 18,7 15,7D 17 18.7 15.7
Thermostatic valves (2-way + 3-way)
Thermostatarmaturen (2-Wege + 3-Wege)Thermostatic valves (2-way + 3-way)
AusgangOutlet
Warm Gemisch KaltWarm Mixed Cold
B 8 12,2 9,3B 8 12.2 9.3
C 8 12 9,2C 8 12 9.2
D 7,8 12,5 9D 7.8 12.5 9
B 14,2 22,3 16,5B 14.2 22.3 16.5
C 14 21,8 16,3C 14 21.8 16.3
D 14,6 22,5 16,6D 14.6 22.5 16.6
Select valves (2-way + 3-way)
Selectarmaturen (2-Wege + 3-Wege)Select valves (2-way + 3-way)
AusgangOutlet
Warm Gemisch KaltWarm Mixed Cold
B 14,6 17,4 14,6B 14.6 17.4 14.6
C 16,5 20,2 16,9C 16.5 20.2 16.9
D 15,6 18,6 15,9D 15.6 18.6 15.9
Single-lever mixer (4-way)
Einhandmischer (4-Wege)Single-lever mixer (4-way)
AusgangOutlet
Warm Gemisch KaltWarm Mixed Cold
A 9,3 10,3 9,8A 9.3 10.3 9.8
B 9,2 10,2 9,7B 9.2 10.2 9.7
C 9,4 10,4 9,8C 9.4 10.4 9.8
D 9,7 10,7 10D 9.7 10.7 10
A 16,8 18,7 17,8A 16.8 18.7 17.8
B 16,6 18,5 17,6B 16.6 18.5 17.6
C 16,8 18,7 17,8C 16.8 18.7 17.8
D 17,3 19,5 18,3D 17.3 19.5 18.3
[pdf] Analysebericht-PGBASIC
Analysis Report
AnalyseberichtAnalysis Report
Introduction
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht.The sample was tested by X-ray fluorescence analysis and yielded the following measurement result.
Report Information
Bericht-Nr.: #2017-749Report No.: #2017-749
Herstellernummer: PGBASICManufacturer Number: PGBASIC
Material Composition
Kupfer Cu 58,679 ± 0,573 57,000 60,000Copper Cu 58.679 ± 0.573 57.000 60.000
Zink Zn 39,262 ± 0,512 37,000 41,500Zinc Zn 39.262 ± 0.512 37.000 41.500
Blei Pb 1,727 ± 0,173 1,600 2,200Lead Pb 1.727 ± 0.173 1.600 2.200
Eisen Fe 0,153 ± 0,049 0,000 0,300Iron Fe 0.153 ± 0.049 0.000 0.300
Zinn Sn 0,114 ± 0,074 0,000 0,300Tin Sn 0.114 ± 0.074 0.000 0.300
Nickel Ni 0,064 ± 0,041 0,000 0,100Nickel Ni 0.064 ± 0.041 0.000 0.100
Aluminium Al 0,000 0,050Aluminum Al 0.000 0.050
Suitability for Drinking Water
Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht.Proof of suitability for drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) has thus been provided.
Material Compliance
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser“- UBA- Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt.The tested material complies with the requirements of the German Federal Environment Agency regarding the "Assessment principles for metallic materials in contact with drinking water"- UBA positive list. According to the Federal Environment Agency, the material meets the DIN 50930-6 standard, which provides information regarding corrosion resistance.
Material Designation
Werkstoff: CW617N (CuZn40Pb2)Material: CW617N (CuZn40Pb2)
Footer
Umweltbundesamt: „Bewertungsgrundlage für metallene Werkstoffe im Kontakt mit Trinkwasser“, (abgerufen am 03.04.2017).German Federal Environment Agency: "Assessment basis for metallic materials in contact with drinking water", (accessed on 03.04.2017).
[pdf] PGBASIC_Anordnungsplan
Components List
Mixed
Product Manuals - PGBASIC - Version 1
Connection Diagram for PGBASIC
Connection Diagram for PGBASIC v1.0 of 1
Installation Instructions
Installation Instructions Be sure to follow the included installation instructions during assembly.
Check the assembly carefully before tiling to ensure correct placement of the consumers!
Check the assembly of the basic body with regard to the components planned for use.
Notes
Notes Hand shower blocked blocked
Rain shower hand shower blocked
Rain shower bathtub inlet hand shower blocked blocked
Bathtub inlet rain waterfall hand shower blocked
Shower system 3-way
Shower system 2-way bathtub set 2-way waterfall
Shower system shower system 4-way hand shower rain shower bathtub inlet consumer 4
Product Manuals - PGBASIC - Version 1.2
Analysis Reports - PGBASIC - Version 1
Product Information
Produktname: PaulGurkes Unterputz Grundkörper für Armaturen bis 4-Wege Product Name: PaulGurkes In-Wall Rough-In Body for Fixtures up to 4-Way
Artikelnummer: PGBASIC Article Number: PGBASIC
Version: v1.2 Version: v1.2
Components
1 - Wasserwaage - 2 1 - Spirit Level - 2
2 - Pappkarte - 1 2 - Cardboard Card - 1
3 - Wasserwaagenrahmen - 1 3 - Spirit Level Frame - 1
4 - Schraube - 6 4 - Screw - 6
5 - Spülvorrichtung - 1 5 - Flush Device - 1
6 - Dichtung für Spülvorrichtung - 1 6 - Seal for Flush Device - 1
7 - Pin - 2 7 - Pin - 2
8 - Dichtmanschette - 1 8 - Sealing Cuff - 1
9 - Grundkörper - 1 9 - Rough-In Body - 1
10 - Spreizbolzen - 4 10 - Expansion Bolt - 4
11 - Innensechskantschlüssel - 1 11 - Hex Key - 1
12 - Verschlussstopfen - 3 12 - Closure Plug - 3
13 - Montageanleitung - 1 13 - Assembly Instructions - 1
14 - Zertifikat & Videoanleitung unter: www.PaulGurkesShop.de 14 - Certificate & Video Instructions at: www.PaulGurkesShop.de
Installation Preparation
Für die Installation der Box wird ein Loch von mindestens 200mm x 220mm benötigt. A hole of at least 200 mm x 220 mm is required for box installation.
Die Einbautiefe beträgt 83mm - 108mm. Installation depth is 83 mm - 108 mm.
Bereiten Sie die Leitungen wie in der folgenden Abbildung vor. Prepare the lines as shown in the following figure.
Der Druck sollte 0,5 - 10 Bar nicht überschreiten. Empfohlener Druck ist 5 Bar. Pressure should not exceed 0.5 - 10 bar. Recommended pressure is 5 bar.
Step 1 of Installation - Preparation
Die Box ist standardmäßig für vier Ausgänge konfiguriert. Für eine Nutzung von einem / zwei oder drei Ausgängen blockieren Sie die Ausgänge wie im unteren Schaubild abgebildet. The box is configured by default for four outlets. For use of one, two, or three outlets, block the outlets as shown in the diagram below.
Bohren Sie die Installationslöcher, wie in der Abbildung zu sehen ist. Drill the installation holes as shown in the illustration.
Platzieren Sie nun die Box in dem Installationsloch und fixieren Sie diese mit den Spreizschrauben. Now place the box in the installation hole and secure it with the expansion bolts.
Für die Installation in eine Ständerwand montieren Sie die Box wie im oberen Schaubild. For installation in a stud wall, mount the box as shown in the upper diagram.
Überprüfen Sie die Festigkeit der Schrauben. Check the tightness of the screws.
Analysis Report
Analysebericht The sample was tested using X-ray fluorescence analysis and produced the following measurement result. The suitability of the product for use in drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is thus proven. The tested material meets the requirements of the German Federal Environment Agency (UBA) concerning "Assessment bases for metallic materials in contact with drinking water" – UBA positive list. The material complies with DIN 50930-6 standard according to the German Federal Environment Agency, which provides statements regarding corrosion resistance.
Material and Designation
Material: CW617N (CuZn40Pb2)
Manufacturer Number: PGBASIC
EAN: 4250914808827
Report No.: #2017-749
Measurement Results
Analysis Report: XL2-99147
Measurement No.: 749
Mode: Alloys
Measurement Duration: 8.6s
Time: 02.12.2017 11:48:23
Manufacturer Number: pgbasic
Material Suggestion: CW617N_CuZn40Pb2
Element Analysis
Element % ± 2σ Min Max
Copper Cu 58.679 ± 0.573 57.000 60.000
Zinc Zn 39.262 ± 0.512 37.000 41.500
Lead Pb 1.727 ± 0.173 1.600 2.200
Iron Fe 0.153 ± 0.049 0.000 0.300
Tin Sn 0.114 ± 0.074 0.000 0.300
Nickel Ni 0.064 ± 0.041 0.000 0.100
Aluminum Al 0.000 0.050
Signatory and Contact
Signatory: Olaf Manusch, Managing Director
Engineering and Quality Management: Marc Manusch, Engineering and Quality Management
Company: PaulGurkes GmbH, Klingenbergstr. 12, 31139 Hildesheim
User Login: Marc Manusch
Date: Hildesheim, December 2, 2017
Layout Plans - PGBASIC - Version 1
Components
1 8PM4X16 1 8PM4X16
2 81BE0000 2 81BE0000
3 80BE0000 3 80BE0000
4 8J128X18A 4 8J128X18A
5 81T23187 5 81T23187
6 85BK001 6 85BK001
7 82BE0000 7 82BE0000
8 8J103X16A 8 8J103X16A
9 8XJBE001 9 8XJBE001
10 84BE0000 10 84BE0000
11 8PM5X12 11 8PM5X12
12 85BE0000 12 85BE0000
13 103BE000 13 103BE000
14 88BM0000 14 88BM0000
15 8XJBE002 15 8XJBE002
16 83BE0000 16 83BE0000
17 8JT1A2D2 17 8JT1A2D2
18 8J22X24A 18 8J22X24A
19 8BS40X112 19 8BS40X112
20 8STG605 20 8STG605
Temperature Ranges
Max Mixed Cold Hot 108 Max Mixed Cold Hot 108
Min Mixed Mixed Mixed 80 Min Mixed Mixed Mixed 80
Manufacturer
PaulGurkes GmbH PaulGurkes GmbH
Miscellaneous Documents - PGBASIC - Version 1
Flow Rates for PGBASIC
v1.0 v1.0
Thermostatic Mixers (2-way + 3-way)
Bar Outlet Hot Water Mixed Cold Water
1 B 8 12,2 9,3
1 C 8 12 9,2
1 D 7,8 12,5 9
3 B 14,2 22,3 16,5
3 C 14 21,8 16,3
3 D 14,6 22,5 16,6
Single-Lever Mixer (2-way)
Bar Outlet Hot Water Mixed Cold Water
1 B 9,5 10,3 8,8
1 D 9,6 10,6 8,9
3 B 16,7 18,3 15,4
3 D 17 18,7 15,7
Select Mixers (2-way + 3-way)
Bar Outlet Hot Water Mixed Cold Water
3 B 14,6 17,4 14,6
3 C 16,5 20,2 16,9
3 D 15,6 18,6 15,9
Single-Lever Mixer (4-way)
Bar Outlet Hot Water Mixed Cold Water
1 A 9,3 10,3 9,8
1 B 9,2 10,2 9,7
1 C 9,4 10,4 9,8
1 D 9,7 10,7 10
3 A 16,8 18,7 17,8
3 B 16,6 18,5 17,6
3 C 16,8 18,7 17,8
3 D 17,3 19,5 18,3

PGTHR23W

[pdf] PGTHR23W-G-v1.0
Components
Nr. Komponente Anzahl 1 Kappe 1 2 Schraube 2 3 Griff 1 4 Pin 1 5 * Blende 0 6 Dichtung 2 7 Schraube 4 8 Fliesenspiegel 1 9 Dichtung 1 10 Armatur 1 11 Dichtungen 7 12 Schlüssel 1 13 Anleitung 1 14 Zertifikat unter: www.paulgurkesshop.de 1 15 Schlüssel 2 * Je nach Modell (rund, eckig)No. Component Quantity 1 Cap 1 2 Screw 2 3 Handle 1 4 Pin 1 5 * Cover 0 6 Seal 2 7 Screw 4 8 Tile Mirror 1 9 Seal 1 10 Fitting 1 11 Seals 7 12 Key 1 13 Instructions 1 14 Certificate under: www.paulgurkesshop.de 1 15 Key 2 * Depending on the model (round, angular)
Information
Information • Diese Armatur kann für 1-3 Verbraucher genutzt werden. • Schließen Sie die Verbraucher gemäß der Anleitung des Grundkörpers „PGBASIC“ an.Information • This fitting can be used for 1-3 consumers. • Connect the consumers according to the instructions of the main unit "PGBASIC".
Installation Instructions
Installationsschritte • Nach der Installation der Unterputz-Box und Prüfung auf Dichtheit ist das Wasser abzustellen. • Entfernen Sie den Schutz der Box. Montieren Sie die Armatur wie im zweiten Schaubild. • Ziehen Sie die Schrauben fest an, vergessen Sie die O-Ringe nicht. • Montieren Sie nun die Abdeckungen wie im dritten Bild. Justieren Sie die Abdeckung, bevor Sie diese fixieren. • Installieren Sie die Blende der Armatur wie im letzten Installationsbild. • Montieren Sie nun den Rest der Armatur.Installation steps • After installing the concealed box and checking for leaks, turn off the water. • Remove the protection of the box. Mount the fitting as shown in the second diagram. • Tighten the screws, do not forget the O-rings. • Now mount the covers as shown in the third picture. Adjust the cover before fixing it. • Install the cover of the fitting as shown in the last picture. • Now assemble the rest of the fitting.
Temperature Adjustment
Temperatur regeln • Regeln Sie die Temperatur wie im unteren Schaubild.Adjusting temperature • Adjust the temperature as shown in the diagram below.
Switching Outlets
Ausgänge schalten • Schalten Sie die Ausgänge der Armatur wie im folgenden Schaubild.Switching Outlets • Switch the fitting outlets as shown in the following diagram.
Cleaning & Maintenance
Säuberung & Wartung Um eine gleichbleibende Qualität zu gewährleisten, ist folgendes zu beachten: • Mit sauberem Wasser abspülen & mit Mikrofasertuch trocknen. • Schmutz nur mit milden Reinigungsmitteln entfernen. • Benutzen Sie keine Scheuermilch, Polierpaste, Papiertücher, etc. • Benutzen Sie keine säurehaltigen Reinigungsmittel oder Seife.Cleaning & Maintenance To ensure consistent quality, please note the following: • Rinse with clean water & dry with a microfiber cloth. • Remove dirt only with mild detergents. • Do not use scouring milk, polishing paste, paper towels, etc. • Do not use acidic detergents or soap.
PaulGurkes Quality
PaulGurkes Qualität • Herzlichen Glückwunsch zum Kauf Ihres PaulGurkes Qualitätsproduktes. Unsere Produkte sind technisch ausgereift und unter Verwendung hochwertiger Materialien gefertigt. • Jedes Produkt unterzieht sich einer handverlesenen Qualitätskontrolle. • Sollten Sie mit unseren Produkten nicht zufrieden sein, kontaktieren Sie uns.PaulGurkes Quality • Congratulations on purchasing your PaulGurkes quality product. Our products are technically sophisticated and made using high-quality materials. • Each product undergoes a hand-picked quality control. • If you are not satisfied with our products, please contact us.
General Notes
Wir behalten uns das Recht vor, Aktualisierungen, Änderungen oder Ergänzungen an den bereitgestellten Informationen und Daten vorzunehmen.We reserve the right to make updates, changes or additions to the information and data provided.
[pdf] Analysebericht-PGTHR23W-PGTHR-3W
Analysis Report Header
AnalyseberichtAnalysis Report
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht.The sample was tested using X-ray fluorescence analysis and yielded the following measurement result.
Report Details
Bericht-Nr.: #2017-742Report No.: #2017-742
Herstellernummer: PGTHR23W / PGTHR-3WManufacturer Number: PGTHR23W / PGTHR-3W
Elemental Composition Table
Kupfer Cu 60,391 ± 0,428 58,000 63,000Copper Cu 60.391 ± 0.428 58.000 63.000
Zink Zn 38,093 ± 0,378 33,500 41,500Zinc Zn 38.093 ± 0.378 33.500 41.500
Blei Pb 1,196 ± 0,111 0,200 1,400Lead Pb 1.196 ± 0.111 0.200 1.400
Eisen Fe 0,125 ± 0,034 0,000 0,300Iron Fe 0.125 ± 0.034 0.000 0.300
Zinn Sn 0,097 ± 0,057 0,000 0,500Tin Sn 0.097 ± 0.057 0.000 0.500
Nickel Ni 0,053 ± 0,030 0,000 0,200Nickel Ni 0.053 ± 0.030 0.000 0.200
Mangan Mn 0,000 ± 0,045 0,000 0,050Manganese Mn 0.000 ± 0.045 0.000 0.050
Silizium Si 0,000 0,050Silicon Si 0.000 0.050
Aluminium Al 0,300 0,900Aluminum Al 0.300 0.900
Compliance Statements
Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht.The proof of suitability in drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is thus provided.
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser“- UBA- Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt.The tested material complies with the requirements of the Federal Environment Agency regarding the "Assessment principles for metallic materials in contact with drinking water" - UBA positive list. According to the Federal Environment Agency, the material meets the DIN 50930-6 standard, which provides statements regarding corrosion resistance.
Material Identification
Werkstoff: CC575S (CuZn39Pb1Al)Material: CC575S (CuZn39Pb1Al)
Signatures
Olaf Manusch GeschäftsführerOlaf Manusch Managing Director
Hildesheim, 2. Dezember 2017Hildesheim, December 2, 2017
Marc Manusch Leitung Technik & QualitätswesenMarc Manusch Head of Engineering & Quality Assurance
Environmental Agency
Umweltbundesamt: „Bewertungsgrundlage für metallene Werkstoffe im Kontakt mit Trinkwasser“, (abgerufen am 03.04.2017).Federal Environment Agency: "Assessment basis for metallic materials in contact with drinking water", (accessed on 04/03/2017).
[pdf] PGTHR23W_Anordnungsplan
Components List

PGHPWAB002

[pdf] Analysebericht-PGHPWAB002
Analysis Report
AnalyseberichtAnalysis Report
Probe Information
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht.The sample was tested using X-ray fluorescence analysis and yielded the following measurement result.
Report Details
Bericht-Nr.: #2017-693Report No.: #2017-693
Herstellernummer: PGHPWAB002Manufacturer number: PGHPWAB002
Material Composition
Kupfer Cu 57,999 ± 0,680 57,000 60,000Copper Cu 57.999 ± 0.680 57.000 60.000
Zink Zn 39,275 ± 0,605 37,000 41,500Zinc Zn 39.275 ± 0.605 37.000 41.500
Blei Pb 2,270 ± 0,225 1,600 2,200Lead Pb 2.270 ± 0.225 1.600 2.200
Eisen Fe 0,238 ± 0,066 0,000 0,300Iron Fe 0.238 ± 0.066 0.000 0.300
Zinn Sn 0,127 ± 0,098 0,000 0,300Tin Sn 0.127 ± 0.098 0.000 0.300
Nickel Ni 0,076 ± 0,049 0,000 0,100Nickel Ni 0.076 ± 0.049 0.000 0.100
Aluminium Al 0,000 0,050Aluminium Al 0.000 0.050
Suitability for Drinking Water Installations
Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht.The verification of suitability for drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is thus provided.
Material Compliance
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser“- UBA- Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt.The tested material complies with the requirements of the Federal Environment Agency regarding the "Assessment principles for metallic materials in contact with drinking water" - UBA positive list. According to the Federal Environment Agency, the material meets the DIN 50930-6 standard, which provides information regarding corrosion resistance.
Material Designation
Werkstoff: CW617N (CuZn40Pb2)Material: CW617N (CuZn40Pb2)
Signatures
Olaf Marmusch GeschäftsführerOlaf Marmusch Managing Director
Marc Manusch Leitung Technik & QualitätswesenMarc Manusch Head of Technology & Quality Assurance
Date and Location
Hildesheim, Montag, 3. April 2017Hildesheim, Monday, April 3, 2017
Source Information
Umweltbundesamt: „Bewertungsgrundlage für metallene Werkstoffe im Kontakt mit Trinkwasser“, (abgerufen am 03.04.2017).Federal Environment Agency: "Assessment basis for metallic materials in contact with drinking water", (accessed on 03.04.2017).
Analysis Reports - PGHPWAB002 - Version 1
Manufacturer Information
Manufacturer PaulGurkes GmbH
Address Klingenbergstr. 12
City and Postal Code 31139 Hildesheim
Analysis Report
Analysis Report XL2-99147
Measurement No. 693
Mode Alloys
Measurement Duration 6.9s
Time 29.09.2017 17:42:17
Manufacturer Number pghpwab002 - body
User Login Marc Manusch
Material Suggestion CW617N_CuZn40Pb2
Element Analysis
Element % | ± | | Min | Max
Copper Cu 57.999 | ± | 0.680 | 57.000 | 60.000
Zinc Zn 39.275 | ± | 0.605 | 37.000 | 41.500
Lead Pb 2.270 | ± | 0.225 | 1.600 | 2.200
Iron Fe 0.238 | ± | 0.066 | 0.000 | 0.300
Tin Sn 0.127 | ± | 0.098 | 0.000 | 0.300
Nickel Ni 0.076 | ± | 0.049 | 0.000 | 0.100
Aluminum Al 0.000 | | | | 0.050
Analysis Reports - PGHPWAB002 - Version 1
Analysis Report
The sample was tested using X-ray fluorescence analysis and produced the following measurement result. The proof of suitability in drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is hereby provided. The sample was tested using X-ray fluorescence analysis and produced the following measurement result. The proof of suitability in drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is hereby provided.
The tested material complies with the requirements of the Federal Environment Agency regarding "Assessment criteria for metallic materials in contact with drinking water" - UBA positive list. The tested material complies with the requirements of the Federal Environment Agency regarding "Assessment criteria for metallic materials in contact with drinking water" - UBA positive list.
According to the Federal Environment Agency, the material meets the DIN 50930-6 standard, which sets out statements regarding corrosion resistance. According to the Federal Environment Agency, the material meets the DIN 50930-6 standard, which sets out statements regarding corrosion resistance.
Material
CW617N (CuZn40Pb2) CW617N (CuZn40Pb2)
Report and Identification Numbers
Report No.: #2017-693 Report No.: #2017-693
Manufacturer No.: PGHPWAB002 Manufacturer No.: PGHPWAB002
EAN: 4250914808674 EAN: 4250914808674
Analysis Report: XL2-99147 Analysis Report: XL2-99147
Measurement No.: 693 Measurement No.: 693
Measurement Results
Element % | ± 2σ | Min | Max
Copper Cu 57,999 | ± 0,680 | 57,000 | 60,000
Zinc Zn 39,275 | ± 0,605 | 37,000 | 41,500
Lead Pb 2,270 | ± 0,225 | 1,600 | 2,200
Iron Fe 0,238 | ± 0,066 | 0,000 | 0,300
Tin Sn 0,127 | ± 0,098 | 0,000 | 0,300
Nickel Ni 0,076 | ± 0,049 | 0,000 | 0,100
Aluminum Al 0,000 | | | 0,050
Measurement Information
Mode: Alloys Mode: Alloys
Measurement Time: 6.9 s Measurement Time: 6.9 s
Time: 29.09.2017 17:42:17 Time: 29.09.2017 17:42:17
Material Suggestion: CW617N_CuZn40Pb2 Material Suggestion: CW617N_CuZn40Pb2
User Login: Marc Manusch User Login: Marc Manusch
Company Information
PaulGurkes GmbH PaulGurkes GmbH
Klingenbergstr. 12 Klingenbergstr. 12
31139 Hildesheim 31139 Hildesheim
Approvals and Date
Managing Director: Olaf Manusch Managing Director: Olaf Manusch
Head of Engineering & Quality Management: Marc Manusch Head of Engineering & Quality Management: Marc Manusch
Date: Hildesheim, Monday, April 3, 2017 Date: Hildesheim, Monday, April 3, 2017

[PDF] Allgemeine Pflegehinweise
Application: Cold and hot water supply
Application area: Bathtub
Colour: Chrome
Connection: High pressure – pressure-resistant
Connection type: Concealed installation unit (included in delivery)

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.


Loading...

Loading 3D model...

Mouse: Rotate | Scroll: Zoom | Right-click: Pan Finger: Rotate | Pinch: Zoom | Two fingers: Pan